|
Preliminary Engineering and Construction Monitoring and Supervision |
a. Planning and Design Section |
– Cost Estimates and Drafting |
b. Construction Section |
– Project Monitoring and Supervision |
Technical management and supervision, Environmental and Water Resources
Management, Infrastructure Planning, Design and Construction |
• Watershed and Wastewater Management |
a. Watershed Section |
– Anayan-Rumangrap, Kalinisan-Nabuntulan and Naga River
Watershed Areas |
b. Wastewater Section |
– Septage collection, treatment and disposal |
|
Division management and supervision, Water Sources Operation, Maintenance
and Potability Assurance |
• Spring Sources and Pumping Stations |
a. Operation Section |
– Water sources operation and housekeeping |
b. Maintenance Section |
– Repairs, troubleshooting and preventive maintenance |
• Laboratory Services |
a. Water Quality Section
|
|
– Water sample collection, analysis and interpretation |
b. Accredited by Department of Health to provide water quality and
evaluation services to other establishments and agencies.
|
|
Transmission lines, distribution and water service connections |
• Operation Section – Service connection and equipment management
|
a. Water Service Connection |
-Service connections application, installation, reconnection, relocation and
elevation, closure of abandoned connections. |
b. Equipment |
-Repairs, troubleshooting and preventive maintenance of equipment. |
• Maintenance Section – Waterline repairs and restoration
|
a.Transmission and Distribution Maintenance Section |
– Non-Revenue Water Reduction and Restoration |
b. Water Meter Maintenance Section |
– Repair, testing and calibration of water meters |